Project Overview
The Jack Pushing Work at Behala SD-34 involves the installation of underground pipelines or utility ducts using the hydraulic jacking method without disturbing the existing road surface. The work includes excavation of launching and receiving pits, installation of jacking equipment, pipe pushing, alignment, and jointing. The main objective is to provide underground utility connections safely and efficiently while minimizing traffic disruption and surface damage.