Wtp Project

1200 dia pipeline work at behala

Project Overview

The 1200 mm diameter pipeline work at Behala involves the installation of a large-diameter pipeline for water supply, drainage, or sewage transportation. The work includes excavation, trench preparation, pipe laying, jointing, alignment, backfilling, and testing. The main objective is to ensure efficient and reliable water or wastewater transmission while improving the area's existing infrastructure.

Project Details

Category Wtp
Status Completed
Back to Projects